Installation of mechanical equipment – SHPP Vrgudinac
PROJECT DESCRIPTION:
The following works were performed during construction of new SHPP Vrgudinac, with total installed power of 1,5 MW:
- Installation of two turbines with double regulation
- Installation of one turbine with single regulation
- Installation, positioning and alignment of three generators
- Installation of cooling water pumps and pipelines
- Installation of lubricating oil systems on all three power generators
- Manufacturing and installation of steel supporting structure in the substation
- Providing assistance during commissioning and trial run monitoring
As well as all other auxiliary installation and mechanical works.
PROJECT: Installation of mechanical equipment – SHPP Vrgudinac
FACILITY: SHPP Vrgudinac
INVESTOR: Power Gen doo, Belgrade
LOCATION: Vrgudinac, Bela Palanka
YEAR OF REALIZATION: 2017.