Overhaul of the turbo aggregate of Blocks B1 and B2

PROJECT DESCRIPTION:

In the overhaul period in 2016, the following is being executed on the B1 Block:

  • Demounting and inspection of turbo aggregate bearings
  • Inspection of steam sealing gap CVP, CSP, CNP1 and CNP2
  • Demounting, inspection, replacement as required and mounting of steam valve sections VP, SP and bypass valve NP
  • Revision of all oil pumps
  • Demounting, inspection, replacement of parts as required and mounting of bearings and steam sections of turbopump turbine

In the overhaul period in 2016, the following is being executed on the B2 Block:

  • Demounting of high-pressure, middle-pressure and low-pressure turbine
  • Demounting of servomotor and steam sections of high-pressure, middle-pressure valve and low-pressure bypass valve
  • Replacement of the CSP internal cabinet with a new one
  • Demounting, overhaul and inspection of turbopump turbine
  • Mounting of high-pressure, middle-pressure and low-pressure turbine
  • Mounting of servomotor and steam sections of high-pressure, middle-pressure valve and low-pressure bypass valve
  • Overhaul of components of lubricating, lifting and regulating oil system

PROJECT: Overhaul of the turbo aggregate of Blocks B1 and B2

FACILITY: “TPP Nikola Tesla” B, Ušće, Blocks B1 and B2

INVESTOR: JP EPS, Belgrade, Thermal Power Plant “Nikola Tesla”, Unit TPP NT B

LOCATION: TPP NT B

YEAR OF REALIZATION: 2016