Overhaul of the A1 Block turbine

PROJECT DESCRIPTION:
In the overhaul period in 2016, the following is being executed:
- Demounting of low-pressure turbine
- Revision and replacement of low-pressure turbine diaphragms
- Demounting, inspection, test and mounting of turbo aggregate bearings
- Inspection of regulating system components
- Inspection of mechanical generator section components
- Mounting of low-pressure turbine
PROJECT: Overhaul of the A1 Block turbine
FACILITY: “TPP Kostolac” A, Kostolac
INVESTOR: JP EPS, Belgrade, company “TPP-KO Kostolac“
LOCATION: “TPP Kostolac” A, Kostolac
YEAR OF REALIZATION: 2016.






