Replacement of the hot steam pipeline for interheated steam

PROJECT DESCRIPTION:
In the period from June to October 2009. there was carried out the replacement of the hot steam pipelines for interheated steam in block B2, with the following characteristics:
- Block power: 640 MW
- Operating temperature and pressure of the fluid: 540°C/42 bar
- Total weight of the dismantled equipment: 640,000 kg
- Total weight of the installed equipment: 512,000 kg
- In total, 189 welds with a size between ф 457x52mm and ф 1004x52mm. The pipeline materials are 15CrMoV510 and X10CrMoVNb91
- There were replaced 108 suspension devices
PROJECT: Replacement of the hot steam pipeline for interheated steam
FACILITY: TPP “Nikola Tesla” block B2
INVESTOR: PU Electric Power Industry of Serbia, Belgrade, TPP “Nikola Tesla” Obrenovac
LOCATION: Tent B, Ušće 11500 Obrenovac
YEAR OF REALIZATION: 2009