Modernization of the turbine

PROJECT DESCRIPTION:
During the period from June to December 2015 there was carried out:
- The disassembly of the high, medium and low-pressure turbine
- The installation of a new high, medium and low pressure turbine
- Disassembly and assembly works on the auxiliary systems of the turbo-generator
- The replacement of the valve chambers and second bearing block with new ones
PROJECT: Modernization of the turbine
FACILITY: TPP Nikola Tesla A, Obrenovac, Block A3
INVESTOR: PE Electric Power Industry of Serbia, Belgrade, TENT, Branch TENT A
LOCATION: Tent A, Bogoljuba Uroševića Crnog 44, 11500 Obrenovac
YEAR OF REALIZATION: 2014.