Capital repair of the turbine generator and modernization of CSP

PROJECT DESCRIPTION:
During the period from July to December 2015 there was carried out:
- The capital repair of the high and low pressure cylinder
- The disassembly of the old middle-pressure cylinder and the old second bearing block, as well as the assembly of the new second bearing block and CSP
As part of the capital repair, there was carried out:
- The repair and modernization of the regulation system and
- The flushing of the oil system.
PROJECT: Capital repair of the turbine generator and modernization of CSP
FACILITY: TPP Morava, Svilajnac, power 125 MW
INVESTOR: PE Electric Power Industry of Serbia, Belgrade, TENT, Branch TPP Morava
LOCATION: TPP Morava, Svilajnac
YEAR OF REALIZATION: 2015.