Modernization of the turbo-generator of block B1

PROJECT DESCRIPTION:

During the period from March to November 2014 there was carried out:

  • The capital repair of the turbine and the mechanical part of the generator
  • The replacement of the high and middle pressure cylinders
  • The modernization of the regulation systems
  • The replacement of the blades of the low-pressure rotor
  • The replacement of the auxiliary stations (oil, water) of the generator

 

PROJECT: Modernization of the turbo-generator of block B1

FACILITY: TPP Kostolac B, Drmno, Blok B1

INVESTOR: PE Electric Power Industry of Serbia, Branch Thermal Power Plants and Mines of Kostolac, Kostolac

LOCATION: TPP Kostolac B, Drmno

YEAR OF REALIZATION: 2014