Modernization of the turbo-generator of block B1

PROJECT DESCRIPTION:
During the period from March to November 2014 there was carried out:
- The capital repair of the turbine and the mechanical part of the generator
- The replacement of the high and middle pressure cylinders
- The modernization of the regulation systems
- The replacement of the blades of the low-pressure rotor
- The replacement of the auxiliary stations (oil, water) of the generator
PROJECT: Modernization of the turbo-generator of block B1
FACILITY: TPP Kostolac B, Drmno, Blok B1
INVESTOR: PE Electric Power Industry of Serbia, Branch Thermal Power Plants and Mines of Kostolac, Kostolac
LOCATION: TPP Kostolac B, Drmno
YEAR OF REALIZATION: 2014