Replacement of the suspended tubes and superheater

PROJECT DESCRIPTION:

In the period from May to September 2011. there were replaced the suspended tubes and superheater 1 on the boiler of Unit 2, with the following characteristics:

  • The power of the block: 640 MW
  • Operating temperature and pressure of the fluid: 540°C/189 bar
  • Total weight of the replaced equipment: 333,400 kg
  • In total, 9,800 welds with a size of ф 51×5 (5.6) mm. The pipeline materials are 13CrMo44 and 15Mo3

PROJECT: Replacement of the suspended tubes and superheater 1 on the boiler of block 2

FACILITY: TPP “Nikola Tesla”, block B2

INVESTOR: PU Electric Power Industry of Serbia, Belgrade, TPP “Nikola Tesla” Obrenovac

LOCATION: Tent B, Ušće 11500 Obrenovac

YEAR OF REALIZATION: 2011.

Other projects

Petrochemical and refinery

deo 1

Rotating equipment

deo 1
Replacement of the suspended tubes and superheater 3 on the boiler of block 2
Replacement of boiler heaters