Replacement of the suspended tubes and superheater
PROJECT DESCRIPTION:
In the period from May to September 2011. there were replaced the suspended tubes and superheater 1 on the boiler of Unit 2, with the following characteristics:
- The power of the block: 640 MW
- Operating temperature and pressure of the fluid: 540°C/189 bar
- Total weight of the replaced equipment: 333,400 kg
- In total, 9,800 welds with a size of ф 51×5 (5.6) mm. The pipeline materials are 13CrMo44 and 15Mo3
PROJECT: Replacement of the suspended tubes and superheater 1 on the boiler of block 2
FACILITY: TPP “Nikola Tesla”, block B2
INVESTOR: PU Electric Power Industry of Serbia, Belgrade, TPP “Nikola Tesla” Obrenovac
LOCATION: Tent B, Ušće 11500 Obrenovac
YEAR OF REALIZATION: 2011.