Disassembling of the existing biflux of boiler 6 and connecting pipelines and installation of new biflux and connecting pipelines

PROJECT DESCRIPTION:

In the period from April to June 2009, the following works were carried out:

  • Disassembling of biflux body
  • Disassembling of connecting pipeline between the outlet chamber of the pre-heater 3 and the inlet chamber of the pre-heater 4
  • Disassembling of the part of the RC pipeline
  • Disassembling of biflux hangers
  • Fabrication and assembling of the steel structure for hangers
  • Assembling of biflux hangers
  • Assembling of biflux
  • Installation of three-way control valve
  • Assembling of connecting pipeline between the outlet chamber of the pre-heater 3 and the inlet chamber of the steam pre-heater 4
  • Cutting of the RC line at an elevation of ± 44.00m, rotation of the pipeline and its welding
  • Connection of biflux with RC line and inlet chamber of steam pre-heater 1
  • Assembling of the vent pipeline
  • Assembling of the drainage pipeline

PROJECT: Disassembling of the existing biflux of boiler 6 and connecting pipelines and installation of new biflux and connecting pipelines

FACILITY: Pipe system of boiler No.6 Thermal Power Plant Kolubara

INVESTOR: Thermal Power Plant Obrenovac

LOCATION: Thermal Power Plant Kolubara, Veliki Crljeni

YEAR OF REALIZATION: 2009.

Other projects

Petrochemical and refinery

deo 1

Rotating equipment

deo 1
Reconstruction works on chimneys of Hot Water Boilers 1, 2 and 3, disassembling and replacement of insulation with corrosion protection works
VI ESC System (Excavator – Conveyors – Spreader) on Drmno OCM, Kostolac, Serbia