Disassembling of the existing biflux of boiler 6 and connecting pipelines and installation of new biflux and connecting pipelines

PROJECT DESCRIPTION:
In the period from April to June 2009, the following works were carried out:
- Disassembling of biflux body
- Disassembling of connecting pipeline between the outlet chamber of the pre-heater 3 and the inlet chamber of the pre-heater 4
- Disassembling of the part of the RC pipeline
- Disassembling of biflux hangers
- Fabrication and assembling of the steel structure for hangers
- Assembling of biflux hangers
- Assembling of biflux
- Installation of three-way control valve
- Assembling of connecting pipeline between the outlet chamber of the pre-heater 3 and the inlet chamber of the steam pre-heater 4
- Cutting of the RC line at an elevation of ± 44.00m, rotation of the pipeline and its welding
- Connection of biflux with RC line and inlet chamber of steam pre-heater 1
- Assembling of the vent pipeline
- Assembling of the drainage pipeline
PROJECT: Disassembling of the existing biflux of boiler 6 and connecting pipelines and installation of new biflux and connecting pipelines
FACILITY: Pipe system of boiler No.6 Thermal Power Plant Kolubara
INVESTOR: Thermal Power Plant Obrenovac
LOCATION: Thermal Power Plant Kolubara, Veliki Crljeni
YEAR OF REALIZATION: 2009.