General overhaul of turbine in unit A2 in TPP KO

PROJECT: – GENERAL OVERHAUL OF TURBINE IN UNIT A2 WITH SUPPLY OF SPARE PARTS LOT 1 – CONTRACTING SPECIALIZED TEAM FOR GENERAL OVERHAUL OF TURBO PLANT IN UNIT A2, SUPPLY AND INSTALLATION OF PARTS IN TURBO PLANT IN UNIT A2
FACILITY: Steam turbine 210MW, type K-200-130-3, TEKO A
INVESTOR: JP EPS Beograd, branch TPP-KO Kostolac, Nikole Tesle 5-7, Kostolac
LOCATION: Kostolac
YEAR: 2020
PROJECT DESCRIPTION:
During 2020 we carried out activities on general overhaul of steam turbine with rated power of 210 MW. Steam turbine in unit A2 is action type and consists of single-flow HPT (12 stages), single-flow MPT (11 stages) and single-shell double-flow LPT (8 stages). Turbine is jet regulated. Overhaul included the following:
- Overhaul on low-pressure cylinder
- Overhaul on high-pressure cylinder
- Overhaul on medium-pressure cylinder
- Turbine bearings and turbo generator shaft
- Regulation system
- Turbine rotor rotating device
- HP and MP stop valves (left and right) steam part
- Regulating valve HP
- Regulating valve MP
- Overhaul of gravity valves and their hydraulic motor
- Transitional HP pipelines, transitional MP pipelines and I, II and III turbine lines
- Generator
- Flushing of oil system on turbo generator
- Overhaul of supply pumps