General overhaul of turbine in unit A2 in TPP KO

General overhaul of turbine in unit A2 in TPP KO

PROJECT: – GENERAL OVERHAUL OF TURBINE IN UNIT A2 WITH SUPPLY OF SPARE PARTS LOT 1 – CONTRACTING SPECIALIZED TEAM FOR GENERAL OVERHAUL OF TURBO PLANT IN UNIT A2, SUPPLY AND INSTALLATION OF PARTS IN TURBO PLANT IN UNIT A2

FACILITY: Steam turbine 210MW, type K-200-130-3, TEKO A

INVESTOR: JP EPS Beograd, branch TPP-KO Kostolac, Nikole Tesle 5-7, Kostolac

LOCATION: Kostolac

YEAR: 2020

PROJECT DESCRIPTION:

During 2020 we carried out activities on general overhaul of steam turbine with rated power of 210 MW. Steam turbine in unit A2 is action type and consists of single-flow HPT (12 stages), single-flow MPT (11 stages) and single-shell double-flow LPT (8 stages). Turbine is jet regulated. Overhaul included the following:

  • Overhaul on low-pressure cylinder
  • Overhaul on high-pressure cylinder
  • Overhaul on medium-pressure cylinder
  • Turbine bearings and turbo generator shaft
  • Regulation system
  • Turbine rotor rotating device
  • HP and MP stop valves (left and right) steam part
  • Regulating valve HP
  • Regulating valve MP
  • Overhaul of gravity valves and their hydraulic motor
  • Transitional HP pipelines, transitional MP pipelines and I, II and III turbine lines
  • Generator
  • Flushing of oil system on turbo generator
  • Overhaul of supply pumps
Overhaul of turbine, generator and valves in TEM
General overhaul of turbo generator in unit B1 at TENT B