Purchase of equipment and performance on construction of pumping station PPS1 in block 38

Purchase of equipment and performance on construction of pumping station PPS1 in block 38

PROJECT: Purchase of equipment and performance on construction of pumping station PPS1 in block 38

FACILITY: Pumping station PPS1, Block 38 in Novi Beograd

INVESTOR: JKP Beogradske elektrane   Savski nasip 11 Novi Beograd

LOCATION: Novi Beograd, Block 38

YEAR: 2017-2020

In the period 2017 to 2020 we purchased, manufactured, delivered, installed and controlled the equipment to be used for construction of pumping station PPS1.

Consortium consisting of the following companies:

Montprojekt, Beograd, consortium leader – electric and measurement-regulation equipment

M-Enterijer, Beograd — construction

Feromont Inženjering Beograd – mechanical engineering

participated in realization of this project.

Pumping station consists of machine room, which has access to control room and room with electric equipment, transformer boxes and switchgear. Circulating pump, three on each distribution and return flow of the main pipe M1 installed in series in first portion of the room. Control room is accessed from machine room. Second part of the machine room is below ±0,00 level and is used to store manifolds for suction and discharge of circulating pumps, with shut-off and protective fittings and dirt separator at the connection of distribution and/or return flow of main pipe M1 to pumping station. Crane with capacity of 3.2t is installed for maintenance and handling of pumps and other equipment. The crane is driven by electric motor.

Installation of technological equipment for delayed coking WP1 and WP2 (DCU Plant) in Oil Refinery Pančevo
General overhaul of turbo generator – TPP Kolubara A5